Browse the latest facts and intelligence extracted from space industry sources.
| Information | Article | Published |
|---|---|---|
Browse the latest facts and intelligence extracted from space industry sources.
total items
| Information | Article | Published |
|---|---|---|
The Resilient Missile Warning & Tracking satellite constellation is part of the United States’ multiorbit missile defense architecture. GeneralCapabilityValue 3.0 |
MDA Space expects to complete its work on MEO EPOCH 2 by 2027. PlanValue 3.6 | Jun 8, 2026 |
MDA Space participated in the transport and tracking layers of Tranches 0, 1, and 2 of the Space Development Agency’s Proliferated Warfighter Space Architecture. GeneralValue 4.0 | Jun 8, 2026 |
MDA Space was selected by BAE Systems for the MEO EPOCH 2 program. RelationshipsValue 4.0 | Jun 8, 2026 |
MDA Space will design and build the antennas and control electronics for BAE Systems’ Resilient Missile Warning & Tracking satellites. RelationshipsCapabilityValue 4.2 | Jun 8, 2026 |
Mike Greenley is the CEO of MDA Space. GovernanceValue 3.2 | Jun 8, 2026 |
The MEO EPOCH 2 contract was added to MDA Space’s order backlog during the first quarter of fiscal year 2026. RelationshipsFinancialPlanValue 4.0 | Jun 8, 2026 |
PierSight, The Takshashila Institution, and Tim Glotch sponsor Moon Monday. RelationshipsValue 2.2 | Jun 8, 2026 |
The Chandrayaan article list includes future Chandrayaan missions such as a sample return mission and a resource prospector. PlanGeneralValue 2.0 | Jun 8, 2026 |
ISRO’s Chandrayaan program includes Chandrayaan 2, Chandrayaan 3, and future missions such as a sample return mission and a resource prospector. PlanValue 4.0 | Jun 8, 2026 |
EREMS has completed a €10 million expansion of its manufacturing facility in France. GrowthFinancialCapabilityValue 4.6 | Jun 8, 2026 |
The EREMS facility expansion added new cleanrooms and an automated production line. GrowthCapabilityValue 4.0 | Jun 8, 2026 |
The Optical Frequency Generator Unit is a photonics-based alternative to electronic frequency generation hardware used in satellite payloads. CapabilityGeneralValue 2.8 | Jun 8, 2026 |
The European Space Agency contract builds on earlier development work completed under the EU-funded PICOMB, ACTPHAST 4.0, and PhotonHub Europe projects. RelationshipsValue 3.8 | Jun 8, 2026 |
One configuration of the Optical Frequency Generator Unit produces stable, low-phase-noise RF carriers for use as a local oscillator in satellite payloads, feeder link transponders, and ground stations. CapabilityValue 4.0 | Jun 8, 2026 |
A second configuration of the Optical Frequency Generator Unit delivers optical outputs for on-board signal distribution in RF photonic satellite architectures. CapabilityGeneralValue 3.6 | Jun 8, 2026 |
The Optical Frequency Generator Unit operates in the optical domain rather than through standard radio-frequency electronics. CapabilityValue 3.2 | Jun 8, 2026 |
The European Space Agency awarded Pilot Photonics a €1 million contract on June 4, 2026, to advance the space readiness of the company’s Optical Frequency Generator Unit. RelationshipsFinancialCapabilityValue 5.0 | Jun 8, 2026 |
The Optical Frequency Generator Unit delivers frequencies from 8GHz to 220GHz with low noise and high power efficiency from a single compact source. CapabilityValue 3.6 | Jun 8, 2026 |
Pilot Photonics has published a technical whitepaper on the Optical Frequency Generator Unit detailing its comb source technology and application areas. CapabilityValue 2.0 | Jun 8, 2026 |
The contract funds space-environment validation of the Optical Frequency Generator Unit. RelationshipsCapabilityValue 4.0 | Jun 8, 2026 |
The contract aims to enable early in-orbit demonstrations of the Optical Frequency Generator Unit. PlanCapabilityRelationshipsValue 4.0 | Jun 8, 2026 |
Eutelsat Group has formalized a strategic distribution partnership with Voimatel to deploy low Earth orbit satellite connectivity services throughout Finland. RelationshipsPlanValue 4.2 | Jun 8, 2026 |
The partnership targets underserved corporate, industrial, and public sector organizations operating in geographically remote environments in Finland. RelationshipsGeneralValue 2.0 | Jun 8, 2026 |
Voimatel’s space-based communication pipeline is independent of localized terrestrial network disruptions. CapabilityGeneralValue 2.0 | Jun 8, 2026 |
Voimatel’s integration of Eutelsat’s space-based assets adds a redundancy layer for its national utility, telecom, and enterprise clientele. RelationshipsCapabilityValue 3.5 | Jun 8, 2026 |
Eutelsat Group has a strategic distribution partnership with Finnish network infrastructure and service provider Voimatel to deploy low Earth orbit satellite connectivity services throughout Finland. RelationshipsPlanValue 4.2 | Jun 8, 2026 |
Voimatel will integrate Eutelsat’s OneWeb low Earth orbit satellite constellation into its enterprise service portfolio. RelationshipsCapabilityValue 4.0 | Jun 8, 2026 |
Voimatel will integrate Eutelsat’s OneWeb low Earth orbit satellite constellation into its existing enterprise service portfolio. RelationshipsCapabilityValue 4.0 | Jun 8, 2026 |
The Eutelsat-Voimatel collaboration expands high-speed, low-latency satellite broadband availability across the Nordic region. RelationshipsGeneralValue 3.0 | Jun 8, 2026 |
EREMS originally expected the Flourens expansion to come online in 2024. PlanValue 2.2 | Jun 8, 2026 |
The Flourens expansion was financed by EREMS with backing from Banque Populaire Occitane. FinancialRelationshipsValue 4.0 | Jun 8, 2026 |
The France 2030 programme is a €2.3 billion initiative to support the expansion of France’s industrial production capacity. FinancialGrowthGeneralValue 4.5 | Jun 8, 2026 |
EREMS allocated approximately €3.5 million of the expansion budget to an automated electronic board assembly line. GrowthCapabilityFinancialValue 4.2 | Jun 8, 2026 |
The completed Flourens expansion added a new 2,000-square-metre building with offices, meeting rooms, and a large testing area. GrowthValue 3.4 | Jun 8, 2026 |
EREMS originally budgeted €7 million for the Flourens expansion. FinancialValue 4.0 | Jun 8, 2026 |
The French government’s "First Factory" call is managed under the France 2030 programme. GovernanceLegalPlanValue 2.0 | Jun 8, 2026 |
The expanded EREMS campus covers 4,000 square metres of industrial floor space, including 450 square metres of cleanrooms. GrowthCapabilityValue 4.0 | Jun 8, 2026 |
The expansion of EREMS’ Flourens facility was selected in November 2022 as one of 18 winners of the French government’s first "First Factory" call. GrowthLegalValue 3.8 | Jun 8, 2026 |
The original Flourens building now includes 250 square metres of additional cleanroom space. CapabilityGrowthValue 3.0 | Jun 8, 2026 |
EREMS allocated €6.7 million of the expansion budget to infrastructure. FinancialGrowthValue 4.0 | Jun 8, 2026 |
EREMS dedicated 150 square metres of the new cleanroom space to an automated production line. CapabilityGrowthValue 4.0 | Jun 8, 2026 |
EREMS said photovoltaic shades over its car park would enable partial energy self-consumption at the expanded facility. CapabilityGrowthValue 2.0 | Jun 8, 2026 |
EnduroSat secured $104 million in October 2025 to ramp up output at its new 17,500-square-metre satellite factory in Sofia. FinancialGrowthCapabilityValue 4.6 | Jun 8, 2026 |
EREMS increased the total budget for the Flourens expansion to more than €10 million. GrowthFinancialPlanValue 4.0 | Jun 8, 2026 |
OHB acquired a facility in Schöneck in October 2025 to increase its electronic component production. GrowthRelationshipsValue 4.0 | Jun 8, 2026 |
EREMS inaugurated its revamped Flourens facility in southwestern France on 5 June 2026 after a three-year, €10 million expansion. GrowthFinancialValue 4.6 | Jun 8, 2026 |
EREMS supplied key elements for Airbus Defence and Space’s CO3D and Pléiades Neo constellations, the French Armed Forces’ CERES constellation, and ESA’s Earth Return Orbiter. RelationshipsGeneralValue 4.0 | Jun 8, 2026 |
EREMS designs and manufactures electronic equipment used primarily for space applications. CapabilityValue 2.5 | Jun 8, 2026 |
Thales Alenia Space inaugurated its €100 million Smart Factory in Rome in October 2025. GrowthFinancialValue 4.0 | Jun 8, 2026 |
The Resilient Missile Warning & Tracking satellite constellation is part of the United States’ multiorbit missile defense architecture.
MDA Space expects to complete its work on MEO EPOCH 2 by 2027.
MDA Space participated in the transport and tracking layers of Tranches 0, 1, and 2 of the Space Development Agency’s Proliferated Warfighter Space Architecture.
MDA Space was selected by BAE Systems for the MEO EPOCH 2 program.
MDA Space will design and build the antennas and control electronics for BAE Systems’ Resilient Missile Warning & Tracking satellites.
Mike Greenley is the CEO of MDA Space.
The MEO EPOCH 2 contract was added to MDA Space’s order backlog during the first quarter of fiscal year 2026.
PierSight, The Takshashila Institution, and Tim Glotch sponsor Moon Monday.
The Chandrayaan article list includes future Chandrayaan missions such as a sample return mission and a resource prospector.
ISRO’s Chandrayaan program includes Chandrayaan 2, Chandrayaan 3, and future missions such as a sample return mission and a resource prospector.
EREMS has completed a €10 million expansion of its manufacturing facility in France.
The EREMS facility expansion added new cleanrooms and an automated production line.
The Optical Frequency Generator Unit is a photonics-based alternative to electronic frequency generation hardware used in satellite payloads.
The European Space Agency contract builds on earlier development work completed under the EU-funded PICOMB, ACTPHAST 4.0, and PhotonHub Europe projects.
One configuration of the Optical Frequency Generator Unit produces stable, low-phase-noise RF carriers for use as a local oscillator in satellite payloads, feeder link transponders, and ground stations.
A second configuration of the Optical Frequency Generator Unit delivers optical outputs for on-board signal distribution in RF photonic satellite architectures.
The Optical Frequency Generator Unit operates in the optical domain rather than through standard radio-frequency electronics.
The European Space Agency awarded Pilot Photonics a €1 million contract on June 4, 2026, to advance the space readiness of the company’s Optical Frequency Generator Unit.
The Optical Frequency Generator Unit delivers frequencies from 8GHz to 220GHz with low noise and high power efficiency from a single compact source.
Pilot Photonics has published a technical whitepaper on the Optical Frequency Generator Unit detailing its comb source technology and application areas.
The contract funds space-environment validation of the Optical Frequency Generator Unit.
The contract aims to enable early in-orbit demonstrations of the Optical Frequency Generator Unit.
Eutelsat Group has formalized a strategic distribution partnership with Voimatel to deploy low Earth orbit satellite connectivity services throughout Finland.
The partnership targets underserved corporate, industrial, and public sector organizations operating in geographically remote environments in Finland.
Voimatel’s space-based communication pipeline is independent of localized terrestrial network disruptions.
Voimatel’s integration of Eutelsat’s space-based assets adds a redundancy layer for its national utility, telecom, and enterprise clientele.
Eutelsat Group has a strategic distribution partnership with Finnish network infrastructure and service provider Voimatel to deploy low Earth orbit satellite connectivity services throughout Finland.
Voimatel will integrate Eutelsat’s OneWeb low Earth orbit satellite constellation into its enterprise service portfolio.
Voimatel will integrate Eutelsat’s OneWeb low Earth orbit satellite constellation into its existing enterprise service portfolio.
The Eutelsat-Voimatel collaboration expands high-speed, low-latency satellite broadband availability across the Nordic region.
EREMS originally expected the Flourens expansion to come online in 2024.
The Flourens expansion was financed by EREMS with backing from Banque Populaire Occitane.
The France 2030 programme is a €2.3 billion initiative to support the expansion of France’s industrial production capacity.
EREMS allocated approximately €3.5 million of the expansion budget to an automated electronic board assembly line.
The completed Flourens expansion added a new 2,000-square-metre building with offices, meeting rooms, and a large testing area.
EREMS originally budgeted €7 million for the Flourens expansion.
The French government’s "First Factory" call is managed under the France 2030 programme.
The expanded EREMS campus covers 4,000 square metres of industrial floor space, including 450 square metres of cleanrooms.
The expansion of EREMS’ Flourens facility was selected in November 2022 as one of 18 winners of the French government’s first "First Factory" call.
The original Flourens building now includes 250 square metres of additional cleanroom space.
EREMS allocated €6.7 million of the expansion budget to infrastructure.
EREMS dedicated 150 square metres of the new cleanroom space to an automated production line.
EREMS said photovoltaic shades over its car park would enable partial energy self-consumption at the expanded facility.
EnduroSat secured $104 million in October 2025 to ramp up output at its new 17,500-square-metre satellite factory in Sofia.
EREMS increased the total budget for the Flourens expansion to more than €10 million.
OHB acquired a facility in Schöneck in October 2025 to increase its electronic component production.
EREMS inaugurated its revamped Flourens facility in southwestern France on 5 June 2026 after a three-year, €10 million expansion.
EREMS supplied key elements for Airbus Defence and Space’s CO3D and Pléiades Neo constellations, the French Armed Forces’ CERES constellation, and ESA’s Earth Return Orbiter.
EREMS designs and manufactures electronic equipment used primarily for space applications.
Thales Alenia Space inaugurated its €100 million Smart Factory in Rome in October 2025.