Browse the latest facts and intelligence extracted from space industry sources.
| Information | Article | Published |
|---|---|---|
Browse the latest facts and intelligence extracted from space industry sources.
total items
| Information | Article | Published |
|---|---|---|
ICEYE received an Australian Space Award at the seventh Australian Space Awards for its operational contribution to Australia’s flood response. RelationshipsValue 2.5 | ICEYE premiata agli Australian Space Awards per il contributo alla risposta alle alluvioni | Jun 28, 2026 |
iQPS was Rocket Lab's largest customer last year, accounting for 6 of Rocket Lab's 21 launches. Relationships |
| Jun 28, 2026 |
Rocket Lab set the launch date for its 92nd mission and 13th Electron launch of 2026. PlanValue 4.0 | Last year, iQPS was Rocket Lab's largest customer with 6 out of 21 launches being for them. Starting with "The Grain Goddess Provides", the pace will be slower with only 8 launches planned by the end of 2028. Launch of QPS-SAR-13 "MIKURA-I" is set for NET June 30th at 01:15 UTC. | Jun 28, 2026 |
QPS-SAR-13 "MIKURA-I" is scheduled to launch no earlier than June 30 at 01:15 UTC. PlanValue 4.0 | Last year, iQPS was Rocket Lab's largest customer with 6 out of 21 launches being for them. Starting with "The Grain Goddess Provides", the pace will be slower with only 8 launches planned by the end of 2028. Launch of QPS-SAR-13 "MIKURA-I" is set for NET June 30th at 01:15 UTC. | Jun 28, 2026 |
Rocket Lab's mission "The Grain Goddess Provides" is a constellation deployment mission for iQPS. PlanValue 3.5 | Last year, iQPS was Rocket Lab's largest customer with 6 out of 21 launches being for them. Starting with "The Grain Goddess Provides", the pace will be slower with only 8 launches planned by the end of 2028. Launch of QPS-SAR-13 "MIKURA-I" is set for NET June 30th at 01:15 UTC. | Jun 28, 2026 |
Rocket Lab will deliver another QPS-SAR satellite to low Earth orbit for iQPS's Earth-imaging constellation. RelationshipsCapabilityPlanValue 4.0 | Last year, iQPS was Rocket Lab's largest customer with 6 out of 21 launches being for them. Starting with "The Grain Goddess Provides", the pace will be slower with only 8 launches planned by the end of 2028. Launch of QPS-SAR-13 "MIKURA-I" is set for NET June 30th at 01:15 UTC. | Jun 28, 2026 |
Rocket Lab has 8 launches planned for iQPS through the end of 2028. PlanGrowthValue 4.0 | Last year, iQPS was Rocket Lab's largest customer with 6 out of 21 launches being for them. Starting with "The Grain Goddess Provides", the pace will be slower with only 8 launches planned by the end of 2028. Launch of QPS-SAR-13 "MIKURA-I" is set for NET June 30th at 01:15 UTC. | Jun 28, 2026 |
Mengzhou’s first orbital flight could come later in 2026 on the Long March 10A rocket. PlanGrowthValue 3.6 | Mengzhou crew spacecraft airdrop test out of a Y-20 transport aircraft. The first orbital flight for Mengzhou could come later this year on the Long March 10A. | Jun 28, 2026 |
The Mengzhou crew spacecraft underwent an airdrop test from a Y-20 transport aircraft. CapabilityValue 4.0 | Mengzhou crew spacecraft airdrop test out of a Y-20 transport aircraft. The first orbital flight for Mengzhou could come later this year on the Long March 10A. | Jun 28, 2026 |
NASA’s Mars Exploration Program and the Exploration Science Strategy Integration Office under the Science Mission Directorate in Washington currently fund the ERNEST program. RelationshipsValue 4.0 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
ERNEST’s software underwent thousands of simulated operational hours in JPL’s Digital Automated Remote Tracking Simulation laboratory before field testing. CapabilityPlanValue 3.5 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
The ERNEST engineering team tested the rover across dawn, dusk, and full nighttime illumination conditions during the desert deployment. CapabilityPlanValue 2.0 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
ERNEST’s localized computer architecture relies on navigation algorithms trained via reinforcement learning. CapabilityValue 2.5 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
NASA confirmed that a prototype four-wheel planetary rover completed high-speed autonomous field trials in the Colorado Desert near Plaster City, California, in a report issued on June 18, 2026. CapabilityGeneralValue 4.0 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
Caltech manages NASA’s Jet Propulsion Laboratory. RelationshipsValue 4.0 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
NASA’s Jet Propulsion Laboratory developed the ERNEST prototype in Southern California. CapabilityValue 3.0 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
ERNEST’s navigation speed is an order of magnitude faster than the navigation speeds achieved by current Mars rovers. CapabilityValue 2.5 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
The ERNEST prototype is 4 feet, or 1.2 meters, long. CapabilityValue 2.8 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
ERNEST integrates an active suspension system with two powered joints per wheel and an articulable gimbal. CapabilityValue 4.0 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
The ERNEST vehicle validated software and mobility architectures for future long-range lunar and Martian exploration missions. CapabilityPlanValue 3.6 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
Program technologists plan to scale the ERNEST architecture up to a vehicle twice the size of the current prototype. PlanCapabilityValue 3.8 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
JPL initially backed ERNEST development with internal research and development allocations. RelationshipsFinancialValue 3.0 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
ERNEST can independently alter weight distribution, switch between wheel-walking, squirming, and obstacle-climbing gaits, and clear vertical barriers nearly equivalent to its wheel height. CapabilityValue 4.6 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
The scaled ERNEST design is intended for long-duration exploration campaigns targeting permanently shadowed crater floors, lava tubes, and water-ice deposits at the lunar south pole. CapabilityPlanValue 3.0 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
Development of the ERNEST platform began in 2022. PlanValue 2.0 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
ERNEST has a mechanical clutch that can toggle the rover into a passive suspension mode to conserve battery power on flat, unobstructed terrain. CapabilityValue 4.2 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
The ERNEST prototype uses custom-engineered wire mesh wheels to maintain traction over loose materials. CapabilityValue 3.5 | NASA Concludes Desert Field Testing for Autonomous Lunar Rover Prototype | Jun 28, 2026 |
Blue Canyon Technologies has more than 3,500 products on orbit. CapabilityGrowthValue 3.7 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
MDA Space expects the Blue Canyon Technologies acquisition to close by the end of 2026, pending customary closing conditions and required regulatory approvals. RelationshipsPlanLegalValue 4.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
Exolaunch has participated in every Falcon 9 Transporter and Bandwagon rideshare mission since those programs began. GeneralValue 2.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
Launches supported by Wallops Flight Facility grew from 3 in 2020 to 17 in 2025. GrowthValue 3.8 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
MDA Space has signed a definitive agreement to acquire Blue Canyon Technologies from RTX’s Raytheon business for $620 million in an all-cash transaction. RelationshipsFinancialValue 5.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
Firefly Aerospace’s Blue Ghost Mission 1 landed successfully in March 2025. PlanValue 4.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
NASA canceled the VIPER mission in July 2024 before Voyager Technologies acquired Astrobotic Technology. RelationshipsPlanValue 4.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
The Space Development Agency’s proliferated low Earth orbit constellation has Tranche 2 production underway and Tranche 3 solicitation activity already on SAM.gov. PlanGrowthValue 4.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
The Defense Microelectronics Activity Trusted Foundry Program lists fewer than five domestic qualified fabs. LegalGeneralValue 2.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
Exolaunch has deployed more than 790 satellites across 47 missions for more than 200 commercial and government customers. CapabilityGeneralValue 3.5 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
NASA is winding down the Space Technology and Aeronautics Research directorates. GovernanceGeneralValue 2.3 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
Blue Canyon Technologies employs more than 400 people across two manufacturing facilities in Denver, Colorado. GrowthValue 3.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
Exolaunch has secured its first dedicated Falcon 9 launches, Exo-1 and Exo-2, scheduled for 2027 and 2028. PlanGrowthRelationshipsValue 4.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
Microchip Technology, BAE Systems Electronic Systems, Honeywell Aerospace, and SkyWater Technology are among the domestic qualified fabs listed in the Defense Microelectronics Activity Trusted Foundry Program. GeneralGovernanceLegalValue 3.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
The Exolaunch acquisition is expected to close in the fourth quarter of 2026. RelationshipsPlanValue 4.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
The European Space Agency has selected the NUVIEW Moonraker mission for a Phase A study under ESA’s Small Missions for Exploration, Destination the Moon program. PlanRelationshipsValue 4.5 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
Voyager Technologies acquired Astrobotic Technology in early 2025. RelationshipsValue 4.3 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
Launches supported by Kennedy Space Center grew from 31 in 2020 to 109 in 2025. GrowthValue 3.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
Exolaunch has maintained a strategic relationship with SpaceX since 2020. RelationshipsValue 3.5 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
Intuitive Machines’ Nova-C lander completed the IM-1 Odysseus flight in February 2024. GeneralValue 3.2 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
NASA’s Office of Inspector General found that Kennedy Space Center in Florida and Wallops Flight Facility in Virginia are both projected to approach or reach operational capacity by 2028 to 2029. PlanGrowthValue 3.6 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
NASA’s proposed fiscal year 2027 budget recommends cutting the Science Mission Directorate by approximately 50 percent relative to fiscal year 2025 enacted levels. FinancialGeneralValue 4.0 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
The GPS III Follow-On program with Lockheed Martin is a sustained multi-year draw through the late 2020s. PlanRelationshipsValue 3.6 | NASA’s Shrinkage and Your Business, and a Coming Crunch at the Nation’s Spaceports | Jun 28, 2026 |
ICEYE received an Australian Space Award at the seventh Australian Space Awards for its operational contribution to Australia’s flood response.
iQPS was Rocket Lab's largest customer last year, accounting for 6 of Rocket Lab's 21 launches.
Rocket Lab set the launch date for its 92nd mission and 13th Electron launch of 2026.
QPS-SAR-13 "MIKURA-I" is scheduled to launch no earlier than June 30 at 01:15 UTC.
Rocket Lab's mission "The Grain Goddess Provides" is a constellation deployment mission for iQPS.
Rocket Lab will deliver another QPS-SAR satellite to low Earth orbit for iQPS's Earth-imaging constellation.
Rocket Lab has 8 launches planned for iQPS through the end of 2028.
Mengzhou’s first orbital flight could come later in 2026 on the Long March 10A rocket.
The Mengzhou crew spacecraft underwent an airdrop test from a Y-20 transport aircraft.
NASA’s Mars Exploration Program and the Exploration Science Strategy Integration Office under the Science Mission Directorate in Washington currently fund the ERNEST program.
ERNEST’s software underwent thousands of simulated operational hours in JPL’s Digital Automated Remote Tracking Simulation laboratory before field testing.
The ERNEST engineering team tested the rover across dawn, dusk, and full nighttime illumination conditions during the desert deployment.
ERNEST’s localized computer architecture relies on navigation algorithms trained via reinforcement learning.
NASA confirmed that a prototype four-wheel planetary rover completed high-speed autonomous field trials in the Colorado Desert near Plaster City, California, in a report issued on June 18, 2026.
Caltech manages NASA’s Jet Propulsion Laboratory.
NASA’s Jet Propulsion Laboratory developed the ERNEST prototype in Southern California.
ERNEST’s navigation speed is an order of magnitude faster than the navigation speeds achieved by current Mars rovers.
The ERNEST prototype is 4 feet, or 1.2 meters, long.
ERNEST integrates an active suspension system with two powered joints per wheel and an articulable gimbal.
The ERNEST vehicle validated software and mobility architectures for future long-range lunar and Martian exploration missions.
Program technologists plan to scale the ERNEST architecture up to a vehicle twice the size of the current prototype.
JPL initially backed ERNEST development with internal research and development allocations.
ERNEST can independently alter weight distribution, switch between wheel-walking, squirming, and obstacle-climbing gaits, and clear vertical barriers nearly equivalent to its wheel height.
The scaled ERNEST design is intended for long-duration exploration campaigns targeting permanently shadowed crater floors, lava tubes, and water-ice deposits at the lunar south pole.
Development of the ERNEST platform began in 2022.
ERNEST has a mechanical clutch that can toggle the rover into a passive suspension mode to conserve battery power on flat, unobstructed terrain.
The ERNEST prototype uses custom-engineered wire mesh wheels to maintain traction over loose materials.
Blue Canyon Technologies has more than 3,500 products on orbit.
MDA Space expects the Blue Canyon Technologies acquisition to close by the end of 2026, pending customary closing conditions and required regulatory approvals.
Exolaunch has participated in every Falcon 9 Transporter and Bandwagon rideshare mission since those programs began.
Launches supported by Wallops Flight Facility grew from 3 in 2020 to 17 in 2025.
MDA Space has signed a definitive agreement to acquire Blue Canyon Technologies from RTX’s Raytheon business for $620 million in an all-cash transaction.
Firefly Aerospace’s Blue Ghost Mission 1 landed successfully in March 2025.
NASA canceled the VIPER mission in July 2024 before Voyager Technologies acquired Astrobotic Technology.
The Space Development Agency’s proliferated low Earth orbit constellation has Tranche 2 production underway and Tranche 3 solicitation activity already on SAM.gov.
The Defense Microelectronics Activity Trusted Foundry Program lists fewer than five domestic qualified fabs.
Exolaunch has deployed more than 790 satellites across 47 missions for more than 200 commercial and government customers.
NASA is winding down the Space Technology and Aeronautics Research directorates.
Blue Canyon Technologies employs more than 400 people across two manufacturing facilities in Denver, Colorado.
Exolaunch has secured its first dedicated Falcon 9 launches, Exo-1 and Exo-2, scheduled for 2027 and 2028.
Microchip Technology, BAE Systems Electronic Systems, Honeywell Aerospace, and SkyWater Technology are among the domestic qualified fabs listed in the Defense Microelectronics Activity Trusted Foundry Program.
The Exolaunch acquisition is expected to close in the fourth quarter of 2026.
The European Space Agency has selected the NUVIEW Moonraker mission for a Phase A study under ESA’s Small Missions for Exploration, Destination the Moon program.
Voyager Technologies acquired Astrobotic Technology in early 2025.
Launches supported by Kennedy Space Center grew from 31 in 2020 to 109 in 2025.
Exolaunch has maintained a strategic relationship with SpaceX since 2020.
Intuitive Machines’ Nova-C lander completed the IM-1 Odysseus flight in February 2024.
NASA’s Office of Inspector General found that Kennedy Space Center in Florida and Wallops Flight Facility in Virginia are both projected to approach or reach operational capacity by 2028 to 2029.
NASA’s proposed fiscal year 2027 budget recommends cutting the Science Mission Directorate by approximately 50 percent relative to fiscal year 2025 enacted levels.
The GPS III Follow-On program with Lockheed Martin is a sustained multi-year draw through the late 2020s.