All verified mentions of this organization in source documents.
In December, defense contractor L3Harris made a $4,700,000,000 bid to acquire Aerojet Rocketdyne.
Maxar Technologies completed the first Critical Design Review of the Maxar 300 series bus for L3Harris Technologies in support of the Space Development Agency’s Tranche 1 Tracking Layer program.
The Maxar 300 series bus CDR was completed for L3Harris Technologies in support of the Space Development Agency’s Tranche 1 Tracking Layer (T1TRK) program.
Maxar will produce 16 Maxar 300 series buses for L3Harris Technologies.
The Space Development Agency’s buses will be shipped to L3Harris’ assembly facility in Palm Bay, Florida.
L3Harris won a $700,000,000 contract from the Space Development Agency to produce 14 satellites for the Tracking Layer Tranche 1 plus two additional satellites for a missile-tracking demonstration.
Maxar Technologies completed the first Critical Design Review of the Maxar 300™ series bus for L3Harris Technologies in support of the Space Development Agency’s Tranche 1 Tracking Layer program.
Work on the L3Harris MEO-MTC contract will be performed at L3Harris’ Fort Wayne, Indiana and Melbourne, Florida facilities.
L3Harris is committed to providing resilient, low-risk, and affordable solutions for Epoch 1 and future Epochs of the Missile Track Custody program.
L3Harris Technologies (NYSE:LHX) received approximately $29,000,000 from the U.S. Space Force Space Systems Command through the Space Enterprise Consortium Other Transaction Authority vehicle for a sensor payload design contract.
The L3Harris sensor payload design contract is to deliver a digital model for the medium Earth orbit (MEO) Missile Track Custody (MTC) Epoch 1 program.
Work on the L3Harris MEO–MTC program will be performed at L3Harris facilities in Fort Wayne, Indiana and Melbourne, Florida.
The U.S. Space Force Space Systems Command awarded L3Harris Technologies approximately $29,000,000 through the Space Enterprise Consortium Other Transaction Authority vehicle for a sensor payload design contract.
L3Harris plans to leverage its work within the integrated missile defense architecture to provide resilient, low-risk, and affordable solutions for Epoch 1 and future Epochs of the MEO–MTC program.
The L3Harris contract is to deliver a digital model for the MEO – Missile Track Custody Epoch 1 program.
Work on the L3Harris MEO-MTC contract will be performed at L3Harris facilities in Fort Wayne, Indiana and Melbourne, Florida.
The U.S. Space Force Space Systems Command awarded L3Harris Technologies a sensor payload design contract worth approximately $29,000,000 through the Space Enterprise Consortium Other Transaction Authority vehicle.
SDA’s Tranche 1 Tracking Layer includes 14 satellites made by Northrop Grumman and 14 satellites made by L3Harris Technologies.
Four L3Harris tracking satellites that are part of Tranche 0 will not launch with the other Tranche 0 satellites and are being moved to a future launch with other Missile Defense Agency sensor satellites.
The Air Force Strategic Development and Planning office is overseeing the L3Harris $81,000,000 SATCOM contract as part of the Global Lightning program.