All verified mentions of this organization in source documents.
The contract between GKN Aerospace and ArianeGroup includes the manufacturing and supply of units for the next 14 Ariane 6 launchers to be produced from now until 2025.
To date, GKN Aerospace has manufactured more than 1,000 combustion chambers and nozzles for the Ariane rocket.
GKN Aerospace has signed a contract with ArianeGroup to supply the next phase of Ariane 6 turbines and Vulcain nozzles.
ArianeGroup has signed exploitation contracts with Sabca, Airbus Spain, Europropulsion, Avio, and MTAerospace.
Ariane 6 provides the flexibility to launch both heavy and light payloads to a wide range of orbits for applications such as Earth observation, telecommunication, meteorology, science, and navigation.
Galaxy 35 and Galaxy 36 were launched aboard Arianespace’s Ariane 5 rocket from Kourou, French Guiana at 3:30 p.m. EST.
Maxar Technologies confirmed that Galaxy 35 and Galaxy 36, built for Intelsat, are performing as expected after launch aboard an Ariane 5 rocket from Arianespace’s launch base in French Guiana.
Galaxy 35 and Galaxy 36 were built by Maxar Technologies for Intelsat and were launched aboard an Ariane 5 rocket from Arianespace’s launch base in French Guiana.
The mission duration for the Ariane 5 launch that deployed MTG-I1, Galaxy 35, and Galaxy 36 was 34 minutes and 37 seconds.
Ariane 5 delivered a total payload mass of 10,972 kg to geostationary orbit on the 2022-12-13 mission.
The 10.972-ton delivery to geostationary orbit was Ariane 5’s second-highest performance after the October 2021 launch of Syracuse A4 and SES-17.
Arianespace operated an Ariane 5 launcher that lifted off from Europe’s Spaceport in Kourou, French Guiana on 2022-12-13 at 5:30 p.m. local time.
ArianeGroup delivers a flightworthy launcher on the launch pad to its subsidiary Arianespace, which sells and operates Ariane 5 from the Guiana Space Center in French Guiana.
Arianespace launched a triple payload on 2022-12-13 from Kourou, French Guiana on a heavy-lift Ariane 5 rocket to geostationary transfer orbit.
During Ariane 5 launch campaigns, Arianespace works closely with the French space agency CNES, which is the design authority for Ariane 5 and is responsible for satellite preparation facilities and the launch base.
The European Space Agency arranged launches of the Euclid astrophysics mission and the Hera asteroid mission on Falcon 9 after those missions lost Soyuz and Ariane 6 launch options.
ArianeGroup released a concept for a vehicle called Smart Upper Stage for Innovative Exploration (SUSIE) designed as a reusable upper stage for Ariane 6 that could be used for cargo and crew transportation.
The first MTG weather satellite will launch from the European spaceport in Kourou, French Guiana, aboard an Ariane 5 rocket.
Arianespace signed a contract with Intelsat to launch two satellite payloads, IS-41 and IS-44, on the heavy-lift Ariane 64 from Europe’s Spaceport in French Guiana in 2025.
Ariane 6’s incremental development is intended to regularly improve the performance of the launch solutions offered by Arianespace for institutional and commercial customers.