All verified mentions of this organization in source documents.
Astrium built Eutelsat 139 West A on the Eurostar 3000 platform.
Ed Spitler held various leadership roles including COO of Vizada and CEO of Astrium Services Government.
Inmarsat’s I-4 F1 satellite operates on the L-band, was manufactured by EADS Astrium, and launched in March 2005 on an ILS mission.
Inmarsat’s I-4 F4 (Alphasat) operates on the L-band, was manufactured by EADS Astrium and Thales Alenia Space, and launched in July 2013 by Arianespace.
Jena-Optronik delivered the Fine Sun Sensor FSS for ASTRIUM's GSTB-V2, Alenia's Radarsat-2, and the CosmoSkymed satellite constellation.
EADS Astrium, now Airbus Defense and Space, built the I-4 F1 satellite, which was launched in 2005 with an initial 13-year design life.
I-4 F1 was built by EADS Astrium (now Airbus Defense and Space) and was launched in 2005.
Badr-6 is based on the Eurostar 2000+ platform developed by Astrium Satellites, now Airbus Defence and Space.
David Robson spent 25 years as head of advanced payloads at EADS Astrium (now Airbus Defence and Space), according to LinkedIn.