All verified mentions of this organization in source documents.
The Ariane 6 Launcher Task Force consists of top management from ESA, CNES, ArianeGroup, and Arianespace.
The Zhuque-3 reusable launcher is constructed from stainless steel and uses methane-liquid oxygen (methalox) propellant.
ISRO’s New Space India Ltd (NSIL) released a Request for Qualification in May 2024 to develop a heavy-lift launcher.
SAST provided the Long March 4B hypergolic launcher for the Yaogan-43 (02) mission and used a 4.2-meter-diameter payload fairing as on the prior launch.
NASA's Space Launch System (SLS) launcher costs $4 billion per flight.
Fire Arrow works with multiple organizations across market analysis, launcher pairing, safety and risk, human factors, environmental impact analysis, airspace change, design, construction, regulatory support, and launch brokerage to deliver turnkey licensed spaceports.
The Ariane 6 Launcher Task Force reports regularly on progress towards the inaugural flight of the Ariane 6 launcher.
The upper composite for Ariane 6 flight model-1 was moved from the encapsulation hall to the launch pad and placed on top of the launcher.
The Ariane 6 Launcher Task Force consists of top management from ESA, CNES, ArianeGroup, and Arianespace.
Equatorial Launch Australia plans the Arnhem Space Centre redevelopment to accommodate future launcher needs and to deliver a state-of-the-art launch services facility with a planned increasing launch cadence to more than 50 launches per year.
Axumite's planned launcher, the McDonnell Douglas F-4 Phantom II, was developed for fleet defense by the US Navy and later adopted by the US Air Force.
The NRO and CIA previously investigated using an SR-71 aircraft as a satellite launcher in 1962 but abandoned the concept.
The report discusses the imminent introduction of the Starship super heavy launcher by SpaceX.
Galactic Energy is developing the Pallas-1 kerosene-liquid oxygen launcher with a payload capacity of 5,000 kg to low Earth orbit or 3,000 kg to a 700 km sun-synchronous orbit.
iSpace is developing the Hyperbola-3 methane-liquid oxygen launcher with a payload capacity of 8,500 kg to low Earth orbit and a first flight planned for 2025.
Orienspace is developing the Gravity-2 kerolox launcher with a payload capacity of 25,600 kg to low Earth orbit, a planned first flight in 2025, and plans for a reusable first stage.
CAS Space is developing the Kinetica 2 kerolox launcher with a payload capacity of 7,800 kg to a 500 km sun-synchronous orbit.
Landspace’s Zhuque-3 is a methalox launcher with a payload capacity up to 21,000 kg to low Earth orbit and a first flight planned for 2025.
Space Epoch is developing the XZY-1 methalox launcher with a payload capacity of 7,000 kg to 1,100 km, a stainless-steel structure, and a first flight in 2025.
The Ariane 6 Launcher Task Force consists of top management from ESA, CNES, ArianeGroup, and Arianespace.