All verified mentions of this organization in source documents.
The Space Development Agency selected L3Harris, Lockheed Martin, and Sierra Space on 2024-01-16 to build and operate 54 satellites equipped with infrared sensors capable of tracking hypersonic missiles in all phases of flight.
The contract awarded to Sierra Space for 18 Tranche 2 satellites is worth $740,000,000.
Geost was selected by Sierra Space to provide 18 infrared payloads for the Space Development Agency’s Tranche 2 satellites, consisting of 16 Mercury missile warning and missile tracking payloads and two Phoenix fire control payloads.
Sierra Space will build the Space Development Agency’s Tranche 2 satellites at the company’s facilities in Colorado.
Sierra Space offers a complete turn-key solution providing Space-as-a-Service.
Sierra Space has delivered the first Dream Chaser spaceplane, Tenacity, to NASA’s Neil Armstrong Test Facility in Sandusky, Ohio.
Sierra Space is developing the first business-ready commercial space station leveraging advanced expandable structural architecture.
Sierra Space's cargo module, Shooting Star™, arrived at the NASA test facility in November.
Sierra Space is committed to ensuring the utmost reliability of its technologies.
The 14 companies selected for LunA-10 are Blue Origin, CisLunar Industries, Crescent Space Services LLC, Fibertek, Inc., Firefly Aerospace, GITAI, Helios, Honeybee Robotics, ICON, Nokia of America, Northrop Grumman, Redwire Corporation, Sierra Space, and SpaceX.
NASA used a high-powered laser to replicate the heat generated by a solar energy concentrator to melt lunar soil simulant within a carbothermal reactor developed by Sierra Space.
The LunA-10 capability study will be a research and development initiative led by Sierra Space under the DARPA contract.
The 14 companies selected for LunA-10 are Blue Origin, CisLunar Industries, Crescent Space Services LLC, Fibertek, Inc., Firefly Aerospace, GITAI, Helios, Honeybee Robotics, ICON, Nokia of America, Northrop Grumman, Redwire Corporation, Sierra Space, and SpaceX.
NASA’s April test used a high-powered laser to replicate the heat generated by a solar energy concentrator and melted lunar soil simulant within a carbothermal reactor developed in-house by Sierra Space.
Sierra Space is bringing on 150 people from Sierra Nevada Corporation with security clearances to work on classified projects as it builds up a national security business unit.
Sierra Space raised $290,000,000 in a Series B round in September that valued the company at $5,300,000,000.
Sierra Space was spun off from Sierra Nevada Corporation in 2021.
Sierra Space completed the first Dream Chaser vehicle, Tenacity, on 2023-11-02 and is ready to ship it to NASA’s Armstrong Test Facility in Ohio for environmental tests.
Sierra Space established a National Security Advisory Group in 2022.
Sierra Space laid off 165 employees who had been working to assemble the first Dream Chaser vehicle, Tenacity, on 2023-11-17.