All verified mentions of this organization in source documents.
Jonathan Cirtain holds a PhD in physics and previously served in senior roles at BWX Technologies and as Chief Strategist at NASA's Marshall Space Flight Center, as well as co-founding the machine learning company Astraea, Inc.
The adapter was built by NASA engineers at the Marshall Space Flight Center in Huntsville, Alabama.
Starpath staff spent about three days at NASA Marshall testing their robot with excavation and mobility trials and collecting performance data.
NASA Marshall's Engineering Test Facility staff prepared a concrete slab with rocky terrain for the robot to interact with before Starpath's travel from California to Alabama.
NASA's Break the Ice Lunar Challenge ran from 2020 to 2024 and was led by the Marshall Space Flight Center with support from NASA's Kennedy Space Center.
Joseph Pelfrey resigned as the director of NASA's Marshall Space Flight Center (MSFC).
NASA Marshall oversees the Human Landing System Program.
Finalists will present their work near NASA's Marshall Space Flight Center in June 2026.
The director of NASA Marshall Space Flight Center has stepped down.
Huntsville is home to NASA's Marshall Space Flight Center and an important center for defense contractors.
Key agencies and commands at Redstone Arsenal include the Army Materiel Command, the Missile Defense Agency, and NASA’s Marshall Space Flight Center.
The Neutral Buoyancy Simulator at Marshall operated from 1968 to 1997 before being replaced by a larger facility south of Houston, Texas.
NASA conducted neutral buoyancy tests at the Marshall Space Flight Center’s Neutral Buoyancy Simulator using truss structures and a Beam Builder mockup mounted to a simulated Shuttle payload bay.
Grumman built a ground demonstration Beam Builder unit that was delivered to NASA’s Marshall Space Flight Center in Alabama in 1978 for testing.
Grumman delivered a ground demonstration unit of the Beam Builder to NASA’s Marshall Space Flight Center in Alabama in 1978 for testing.
NASA’s Lyndon B. Johnson Space Center and the Marshall Space Flight Center jointly produced a 40-page report on the proposed Skylab rescue plan.
PTD-4 will test LISA-T, a multi-functional lightweight solar panel system developed by NASA’s Marshall Space Flight Center.
CesiumAstro was awarded a contract by NASA’s Marshall Space Flight Center on 2024-07-29 to develop critical navigation technology for future lunar missions.
Voyager Space was awarded a Collaborative Announcement Notice by NASA’s Marshall Space Flight Center to jointly develop an airlock for the Mars Transit Vehicle, also referred to as Deep Space Transport.
A 12-month study will begin 2024-05 using resources from both Voyager Space and the Habitation team at NASA’s Marshall Space Flight Center to evaluate the extensibility of Voyager’s Bishop Airlock design to the Mars Transit Vehicle architecture.