All verified mentions of this organization in source documents.
The Federal Trade Commission required Northrop Grumman to supply solid rocket motors to its competitors and to run its solid rocket motor business separately from its other businesses.
United Launch Alliance selected Orbital ATK boosters in 2015 for future Atlas flights and for its Vulcan next-generation launch vehicle, prompting Aerojet Rocketdyne to close its Atlas 5 booster business.
The Air Force decided to begin modernizing its missile warning constellation within the next five years and awarded Lockheed Martin the contract for geostationary orbit satellites and Northrop Grumman the contract for polar orbit satellites.
Ryan has held senior-level roles at Northrop Grumman.
Problems with Northrop Grumman’s development of the James Webb Space Telescope, including avoidable human mistakes, have led to development delays and the potential to breach the project’s $8,000,000,000 cost cap.
Northrop Grumman is building unfurlable reflectors for the two Inmarsat-6 satellites that Airbus is building.
Intelsat awarded contracts to Orbital ATK subsidiary SpaceLogistics for two Mission Extension Vehicles slated to launch in 2019 and 2020.
MEV-1 is being built at Orbital ATK’s Dulles, Virginia factory.
The 2016 legislation grants the military authorities to expedite procurement of next-generation satellites that the Air Force Space and Missile Systems Center is using to buy five missile-warning satellites from Lockheed Martin and Northrop Grumman.
The U.S. Federal Trade Commission cleared Northrop Grumman’s $7,800,000,000 purchase of Orbital ATK.
The U.S. Air Force plans to acquire a new intercontinental ballistic missile called the Ground Based Strategic Deterrent with Northrop Grumman and Boeing competing for the award.
To acquire Orbital ATK, Northrop Grumman paid $7,800,000,000 in cash and assumed $1,400,000,000 in debt.
With the addition of Orbital ATK, Northrop Grumman’s sales for 2018 should reach $30,000,000,000.
Northrop Grumman announced the $9,200,000,000 deal to acquire Orbital ATK on 2018-09-18.
Orbital ATK will build future satellites in the Joint Polar Satellite System series under a contract awarded in March 2015.
Intelsat purchased a satellite called Galaxy-30 from Orbital ATK in January.
Orbital ATK is developing the OmegA launch vehicle for EELV missions for the U.S. Air Force and will reevaluate the vehicle concept if it does not win a Launch Services Agreement award from the Air Force later 2018.
The Falcon 9 first stage used on 2018-05-22 was a reused booster that previously launched Northrop Grumman’s Zuma mission in January.
Northrop Grumman announced a deal in September to acquire Orbital ATK for $9,200,000,000.
An Orbital ATK Antares rocket launched a Cygnus cargo spacecraft to the International Space Station on 2018-05-21 from Pad 0A at the Mid-Atlantic Regional Spaceport on Wallops Island, Virginia.