All verified mentions of this organization in source documents.
OneWeb Satellites’ new $85,000,000 factory in Florida’s Exploration Park is set up to build two satellites a day when it reaches full-scale operations.
Elon Musk indicated that Starlink does not require 12,000 satellites to be successful and that SpaceX could scale the constellation up to 12,000 satellites based on demand.
The scope and scale of threats to U.S. space systems is at an all-time high and expanding.
The European Space Agency’s 22 member states agreed on 2019-04-17 to a workaround to enable full-scale Ariane 6 production despite a shortfall of public sector launch contracts.
GomSpace planned in its 2018 annual report to begin large-scale manufacturing of nanosatellites and establish facilities to produce as many as 350 satellites per year.
Gen. John Hyten believes that demonstrating LEO constellation concepts does not require building 500 satellites and that the key is proving the concept can scale.
Wafer’s cost target for user terminals intended for large-scale consumer markets is between $200 and $300, all-in and delivered to the customer.
For ISR applications, FlexAir offers 3 Mbps from the aircraft with an option to scale up to 6 Mbps.
DARPA’s objective for Blackjack is to achieve economies of scale by developing a pipeline of spacecraft synchronized with the Telesat spacecraft production line to lower spacecraft bus costs.
NASA plans to develop human-scale lunar landers beginning with a descent stage that can be tested at the moon as soon as 2024.
The Falcon 9 upgraded second stage is intended to test technologies needed for the full-scale BFR spaceship, including ultra light heat shield and high-Mach control surfaces that require orbital entry for testing.
ThinKom envisions producing around 10,000 or more enterprise terminals per year for Telesat to achieve necessary scale to keep prices low.
Paul Allen returned to the space business in 2011 by funding Stratolaunch Systems to develop a large-scale air-launch system.
In 2016 China used the first flight of the Long March 7 to launch a scale model of a new return module to test re-entry and landing profiles for a new spacecraft.
Stratolaunch plans to perform a full-scale test of the PGA preburner by the end of 2018 at NASA’s Stennis Space Center in Mississippi.
Viasat plans the ViaSat-3 satellite series to provide greater speeds, increased reliability, and built-in scale to serve millions of passengers daily across multiple continents.
Europe planned to reduce Ariane 6 production costs by producing the common P120 solid rocket booster for both Vega C and Ariane 6 to gain economies of scale.
The Pentagon will establish a Space Development Agency to develop and field space capabilities at speed and scale.
ThrustMe plans to ship five thrusters for two customers next year and scale up by 2020 to ship 50 to 70 thrusters per year.
Oxford Space Systems tested a 4-meter deployable antenna and can scale that product up to 14 m in diameter.