All verified mentions of this organization in source documents.
Zeno Power aims to scale up its efforts to acquire multiple kilograms of Americium-241 to conduct more than one mission a year.
The delivery of lunar regolith simulant to UNSW's Moonyard Test Bed allows for large-scale testing of rover mobility and excavation.
Simulations at the scale of EDGE would take decades to run on standard computing hardware.
MBS is a German space company providing and operating full scale responsive space missions.
MBS’s services include mission-critical SATCOM, situational awareness, and managed gateway services on a global scale.
MBS is a German space company providing and operating full scale responsive space missions.
Axiom Space's initiative is focused on operating on a global scale and may connect researchers from countries like China, which cannot engage in scientific research funded by the U.S. government, with NASA.
Additional BADGER units are nearing completion for delivery in early 2026 to support full-scale overseas deployment.
Through 2023, sub-scale tests for the YF-215 completed verification of igniters and turbopumps.
Geely has extended its reach into aerospace, seeking to provide Internet of Things (IoT) connectivity on a global scale.
The Space-IX initiative aims to link orbital systems at scale.
The Tenchi Jin Compass assesses leak risks using a unit mesh size of approximately 100 square meters on a five-level scale.
The BEAP test stand comprises a 50-metre-high tower for full-scale testing of boosters.
The alliance plans to deploy space-based tools and operational services at a local scale to support least-developed countries and small-island developing states.
Swach Environment has expertise in engineering procurement construction, operation and maintenance, and build-own-operate-transfer models for large-scale water infrastructure projects across India.
PLD Space successfully completed a burst test of a full-scale prototype of its MIURA 5 first stage booster.
North American destroyed both Half Scale Test Vehicles by March 11, 1963 due to repeated test failures.
The Ames Research Center tested a half-scale paraglider wing in a wind tunnel on May 23, 1962.
As more satellites are launched, Messium will be able to scale quickly but is not planning to develop its own constellation.
On September 7, 1962 two of the Full Scale Test Vehicle’s three parachutes were lost during a drop and the model hit the ground hard and was slightly damaged.