No description available.
Launch Date
11/15/2025
Launch Site
CC LC40
,
Launch Vehicle
Falcon 9 FT5 (Falcon 9 Family)
As of November 14, 2025, Starlink Group 6-85 was assigned as the second launch in the paired Florida Starlink sequence with Starlink 6-89 and was designated backup launch opportunity #7.
As of November 15, 2025, SpaceX reported deployment of a second set of 29 Starlink satellites following the launch sequence that included Starlink Group 6-85.
SpaceX operated a mission launch page for Starlink Group 6-85 at https://www.spacex.com/launches/sl-6-85.
CelesTrak's Supplemental GP Element Sets were listed as current for Starlink Group 6-85 as of November 14, 2025 17:30:34 UTC.
CelesTrak's Pre-Launch Derived Orbit for Starlink Group 6-85 was 258 km x 267 km x 43.00 deg current as of November 13, 2025 04:17:44 UTC.
The initial orbit for Starlink Group 6-85 was 258 km x 267 km at 43.00 degrees inclination.