Polaris IntelligencePolaris Intelligence
InformationOrganizationsSpacecraftMissionsConstellationsLaunch VehiclesLocations
© Polaris Intelligence 2025Admin

M2

retired
Admin Edit
Launched 3/22/2021
Technical Specifications
Verified technical details
Dry Mass
10 kg
Total Mass
10 kg
Power
Unknown
Design Life
Unknown
Stakeholders

Operator

University of New South Wales

Manufacturer

University of New South Wales
Launch Mission

They Go Up So Fast

3/22/2021

Entity Mentions
All verified mentions of this entity in source documents

A 2017 presentation and paper showed the UNSW Canberra Space M2 design deploying from a 12U dispenser and separating into two 6U satellites after deployment.

Mentioned as: M2SourceFeb 3, 2026

Work on M1 and M2 and their planned launches on SpaceX Falcon 9 rockets is funded from $95,000,000 ispace raised in late 2017.

Mentioned as: M2SourceOct 24, 2019

ispace is developing a second lander, M2, similar in design to M1 that is scheduled for launch in late 2024 and that will carry customer payloads and an ispace-developed micro rover.

Mentioned as: M2SourceApr 25, 2023