Polaris IntelligencePolaris Intelligence
InformationOrganizationsSpacecraftMissionsConstellationsLaunch VehiclesLocations
© Polaris Intelligence 2025Admin

ArianeGroup

FR
commercial
France
www.ariane.group/de
Admin Edit

Verified facts grounded in source documentation.

ArianeGroup is expected to oversee casting of the P120C boosters for the Ariane 6 maiden flight in the first quarter of 2021.

NARRATIVE GENERAL10/29/2020ESA requests €230 million more for Ariane 6 as maiden flight slips to 2022

The first of the 2017-ordered Ariane 62 launches slipped to 2021 due to a disagreement between ArianeGroup and the European Space Agency that delayed the start of serial production until April 2019.

ORG RELATIONSHIP1/23/2020EU reserves four Ariane 6 rockets for Galileo navigation satellites

ArianeGroup is building 15 Ariane 6 rockets: one for the rocket’s maiden flight and 14 in bulk to cover the 2020 to 2023 transition away from the Ariane 5.

NARRATIVE GENERAL1/23/2020EU reserves four Ariane 6 rockets for Galileo navigation satellites

ArianeGroup plans to increase the APU run time so Ariane 6 can inject more than 5,000 kg directly to GEO and enable sequential spacecraft separations to reduce collision risk.

NARRATIVE GROWTH11/22/2019Five upgrades ArianeGroup wants Europe to consider for Ariane 6

ArianeGroup plans to increase the APU run time so Ariane 6 can inject more than 5,000 kg directly to GEO and enable sequential spacecraft separations to reduce collision risk.

NARRATIVE PLAN11/22/2019Five upgrades ArianeGroup wants Europe to consider for Ariane 6

Roughly 100 of the 550 people employed at ArianeGroup’s Bremen site are working in the new integration facility.

NARRATIVE GROWTH10/30/2019WRC-19 begins • Hiber buys green thrusters • Ariane 6 facility inaugurated in Germany

ArianeGroup and Avio are using booster commonality of the P120C between Ariane 6 and Vega C to increase production scale and lower costs for both rockets.

NARRATIVE GROWTH5/10/2019Avio gets ESA assurance for transition missions from Vega to Vega C

ArianeGroup aims to build the Ariane 6 at least 40 percent cheaper than the Ariane 5.

NARRATIVE PLAN5/6/2019ArianeGroup applying launch cost reduction targets to satellite components

ArianeGroup and PTScientists received a contract from ESA on 2019-01-21 to study a proposed lander mission to mine lunar regolith and demonstrate resource extraction viability.

ORG RELATIONSHIP1/29/2019IAI to partner with OHB on lunar delivery services

ArianeGroup received the one-year contract from ESA on 2019-01-21 to study a lunar lander mission proposal that would launch by 2025.

ORG RELATIONSHIP1/22/2019ArianeGroup and PTScientists to study lunar lander mission for ESA

ArianeGroup issued a press release on 2018-11-26 announcing the leadership change.

NARRATIVE GOVERNANCE11/26/2018ArianeGroup names new CEO

ArianeGroup is working with MT Aerospace on implementing carbon fiber cryogenic tanks and other carbon fiber structures for the Ariane 6 upper stage.

ORG RELATIONSHIP5/30/2018Germany trades P120 booster production for Ariane 6 turbo pumps, upper stage carbon fiber research
Page3of3