Verified facts grounded in source documentation.
The Evolution Space Propulsion Center will host Evolution Space’s 200-gallon propellant mixer, provide propellant storage, and serve as an operational base for static fire testing using the E-3 Test Complex.
Evolution Space conducted its first launch that passed the 100-kilometer Kármán Line on 2023-04-22, reaching a peak altitude of 124 km.
In May, Evolution Space conducted tests of a new suborbital vehicle that was built in three weeks for less than $50,000 and demonstrated improvement in the company’s guidance, navigation, and control system.
Evolution Space signed a memorandum of understanding with Xenesis to launch a small satellite constellation.