Verified facts grounded in source documentation.
Reaction Dynamics will visit the Koonibba Test Range later 2024 ahead of the Aurora mission scheduled to launch in 2025.
Reaction Dynamics signed a contract with Southern Launch to conduct the inaugural launch and flight of the RE-102 hybrid rocket engine and Aurora vehicle from the Koonibba Test Range in Australia in 2025.
Reaction Dynamics signed a contract with Southern Launch to conduct the inaugural launch and flight of the RE-102 hybrid rocket engine and Aurora vehicle from the Koonibba Test Range in Australia in 2025.