Verified facts grounded in source documentation.
In 2022 GKN Aerospace showcased an 8-foot titanium additive-manufactured demonstrator, the largest AM component the company had produced, in partnership with Northrop Grumman.
GKN Aerospace signed a contract with ArianeGroup to supply the next phase of Ariane 6 turbines and Vulcain nozzles.
GKN Aerospace has signed a contract with ArianeGroup to supply the next phase of Ariane 6 turbines and Vulcain nozzles.
GKN Aerospace’s restructuring plans predate the start of an £8,000,000,000 ($11,000,000,000) hostile takeover by Melrose in 2018.