Polaris IntelligencePolaris Intelligence
InformationOrganizationsSpacecraftMissionsConstellationsLaunch VehiclesLocations
© Polaris Intelligence 2025Admin

NASA

US
gov civilFounded 1958
Admin Edit

Verified facts grounded in source documentation.

With just over three years remaining to the 2024 goal, the GAO found that NASA lacks insight into the cost and schedules of some of its largest lunar programs because some programs have not established cost and schedule estimates or baselines.

NARRATIVE GENERAL5/27/2021GAO report identifies technical and management risks with Artemis

NASA and Boeing plan to launch the OFT-2 Starliner on a United Launch Alliance Atlas V at 2:53 p.m. Eastern on 2021-07-30.

NARRATIVE GROWTH5/6/2021Starliner test flight scheduled for July 30

NASA approved plans to launch a SpaceX commercial crew mission to the International Space Station pending resolution of one minor issue with the Falcon 9 rocket.

NARRATIVE GROWTH4/16/2021NASA approves plans for Crew-2 launch

NASA expects to launch the first two Gateway modules, the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO), on a SpaceX Falcon Heavy in 2024 under a contract awarded 2021-02-09.

NARRATIVE GROWTH4/15/2021NASA delays starting contract with SpaceX for Gateway cargo services

Jim Bridenstine led partnering efforts under NASA’s Commercial Crew Program that resupplied the International Space Station with American rockets for the first time since the end of the Space Shuttle program in 2011.

NARRATIVE GENERAL4/1/2021Former NASA administrator Jim Bridenstine joins Viasat’s board

NASA’s strategic workforce planning effort foresees reducing the number of permanent full-time equivalent positions by 10% over five years while allowing centers to hire staff as needed for the duration of specific projects.

NARRATIVE GOVERNANCE2/21/2021Safety panel recommends NASA develop strategy for workforce and infrastructure

NASA and Boeing plan to launch the CST-100 Starliner on a second uncrewed test flight no earlier than 2021-04-02.

NARRATIVE GROWTH2/20/2021Northrop Grumman launches Cygnus cargo spacecraft to space station

Kam Ghaffarian founded and led Stinger Ghaffarian Technologies, which became NASA’s second-largest engineering services contractor before being acquired by KBR in 2018.

NARRATIVE GENERAL2/17/2021Axiom Space’s Series B Funding Raises Millions

The 2021-01-17 LauncherOne mission successfully deployed 10 payloads for NASA’s Launch Services Program (LSP).

TECHNICAL PRODUCT1/17/2021Virgin Orbit’s 2nd Launch Demo Is Completed + 10 Smallsats Air Launched Via The LauncherOne Rocket

NASA is currently authorized to operate the International Space Station through 2024.

NARRATIVE GENERAL1/12/2021NASA to upgrade space station solar arrays

If the 2021-01-17 hotfire date holds, the test will take place almost exactly one year after NASA installed the core stage on the B-2 test stand at Stennis.

NARRATIVE GENERAL1/6/2021NASA to conduct SLS static-fire test in mid-January

The updated National Space Policy released 2020-12-09 directs OSTP, in cooperation with NASA and other agencies, to develop new planetary protection guidelines working with scientific, commercial, and international partners.

NARRATIVE PLAN12/30/2020White House releases planetary protection strategy

NASA plans to launch the Lucy mission in October 2021 as the first mission to visit Jupiter Trojans.

NARRATIVE GROWTH12/21/2020Chang’e-5 orbiter embarks on extended mission to Sun-Earth Lagrange point

Starliner-1, the first operational Starliner mission, is scheduled to launch no earlier than the end of 2021 with NASA astronauts Sunita Williams, Josh Cassada, and Jeanette Epps plus a fourth crew member to be assigned.

NARRATIVE GENERAL12/11/2020Next Starliner test flight scheduled for late March

NASA is developing new procedures for loading liquid oxygen into the SLS core stage and is tentatively planning to reschedule the wet dress rehearsal for the week of 2020-12-14.

NARRATIVE PLAN12/10/2020Latest SLS core stage test issues leave little margin in schedule for first launch

The Senate fiscal year 2021 bill provides NASA with its highest funding level in nominal dollars.

NARRATIVE GENERAL11/11/2020Senate bill offers NASA only a fraction of requested lunar lander funding

NASA is delaying the launch of the first operational SpaceX commercial crew mission Crew-1 to the first half of November to provide more time to review a problem observed during a recent Falcon 9 launch attempt.

NARRATIVE GENERAL10/10/2020NASA delays commercial crew mission to study Falcon 9 engine issue

NASA assigned Jeanette Epps to the first operational CST-100 Starliner mission to the International Space Station on 2020-08-25.

NARRATIVE GENERAL8/25/2020NASA astronaut bumped from Soyuz flight added to Starliner mission

Rocket Lab won a contract from NASA in February to launch the CAPSTONE cubesat mission to the moon.

ORG RELATIONSHIP8/11/2020Rocket Lab ready to attempt Electron booster recovery

NASA’s Demo-2 mission successfully flew two NASA astronauts to the International Space Station and returned them to Earth on 2020-08-02 after a two-month mission.

TECHNICAL PRODUCT8/5/2020SpaceX Starship prototype finally flies
Page8of12